Construction of the 1st Special Forces Regional Training Center Kandak, 1st Commando Brigade Headquarters Gardez province. This project is defined as the management, design, material, labor, and equipment, to design and construct and/or refurbish all utilities, roads, buildings, force protection measures, site security, de-mining activities, electrical power expansion and distribution, arch-span/K-span facilities, parking, site utilities, and other support facilities and other features. Innovative Technical Solutions, Inc. (ITSI) has been awarded a Prime Contract task order (Contract No.: FA8903-06-D-8513 Task Order 0045 by its Client, AFCEE, for Design and Construction of the 1st Special Forces Regional Training Center Kandak, 1st Commando Brigade Headquarters, and Transient Kandak; at Gardez, Afghanistan (the Project). And GDCC Perform the job as a Subcontractor to ITSI . The objective of the Project is to Construct the 1st Special Forces Regional Training Center Kandak, 1st Commando Brigade Headquarters, and Transient Kandak; at Gardez, Afghanistan (the Project.

GDCC pursuant to its Fixed Unit Rates/NTE Subcontract with ITSI, perform all Construction as required of ITSI by ITSI’s Prime Contract task order (Work), as further described in this Statement of Work (SOW). This SOW describes the Work to be performed by Subcontractor on the Project. The facility has Potable water treatment, storage, and distribution, Wastewater collection, treatment, and elimination , Electrical power generation and distribution , Entry Control Point (ECP) , electrical systems , Perimeter / Exterior / Street Lighting , Mechanical Work ,barracks, toilets, DFAC, offices, arms rooms, and holding cells.

4. Project Name: ANP Renovation of RTC Jalalabad WPP Compound at Rodat, Nangarhar,
Afghanistan.
Contract Number: W5J9JE-15-C-0020

Year: 2015-2017

Client: US Army Corps of Engineers

Category: Construction

Location: Jalalabad Nangarhar